Em Wind Farm

Em wind farm is located outside Mönsterås in Kalmar County in southeast Sweden.

Ownership: 90.1 %
Production: 22 GWh
Installed capacity: 9.2 MW

Em wind farm is Statkraft’'s first wind power facility in Sweden. The wind farm is comprised of four turbines with a total installed capacity of 9.2 MW.

The Em wind farm is the first concrete result of a comprehensive collaboration between Statkraft and the forestry and timber product company Södra.