Site: Follum (Oslo DCLO)

Norway / Other activities / Project

115 Ha of land, 70 km to Oslo Airport Gardermoen and 60 km to the city centre of Oslo. 100 MW is available from a substation today, additional 200 MW within 3-5 years.

follum
Follum
Statkraft

Follum data center site

Project 60°12'02.7N 10°14'09.1E

Follum is a 60 min drive from Oslo city centre and Oslo International airport. The site is flat with well-drained and stable subsoil. Local DSO can deliver 100 MW from the local substation within 12 months from investment decision. Plans are in development for further 200+ MW within 3 to 5 years. Adjacent river with high cooling water capacity.

The site is facilitated by Statkraft, based on agreements with private owners. The topography is flat, 500ft / 150m above sea level and 100ft / 35m above adjacent river. Annual mean temperature: 5.1° C /41.28°F and annual precipitation: 32 inches (820 mm).

Dark fibre can be provided from 3 or more providers with connections to Stockholm, London, Amsterdam and Frankfurt. Water & sanitary is provided by municipal water to site and industry water from adjacent river with landowner water rights. Current zoning plan with plot ratio of 0.3 and 2 storeys building height. New Zoning plan is in development with increased building footprint and 30 m+ building height.

Owner The site is facilitated by Statkraft, based on agreements with three private owners
Location Ringerike, Viken
Site accessibility & infrastructure Oslo Airport:           70 km
Train station:            5 km
Highway E16:         1,5 km
Oslo City Center:     60 km
Available power 100 MW available from substation today with additional 200 MW+ within 3-5 years
Connectivity Dark fibre can be provided from
3 or more providers
Zoning Current zoning plan with plot ratio of 0.3 and 2 storeys building height. New Zoning plan in development with increased building footprint and 30 m+ building height. 

  • Substation Capacity
    100 MW (200 MW + within 3-5 years)
  • International Airport
    70 km

Other data center sites