Countries

Global flag icon
Global
Albania flag icon
Albania
Brazil flag icon
Brazil
Chile flag icon
Chile
France flag icon
France
Germany flag icon
Germany
India flag icon
India
Ireland flag icon
Ireland
Netherlands flag icon
Netherlands
Norway flag icon
Norway
Peru flag icon
Peru
Spain flag icon
Spain
Sweden flag icon
Sweden
Turkey flag icon
Turkey
United Kingdom flag icon
United Kingdom
United States flag icon
United States

Site: Follum (Oslo DCLO)

Norway / Other activities / Project

115 Ha of land, 70 km to Oslo Airport Gardermoen and 60 km to the city centre of Oslo. 100 MW is available from a substation today, additional 200 MW within 3-5 years.

follum
Follum
Statkraft

Follum data center site

Project 60°12'02.7N 10°14'09.1E

Follum is a 60 min drive from Oslo city centre and Oslo International airport. The site is flat with well-drained and stable subsoil. Local DSO can deliver 100 MW from the local substation within 12 months from investment decision. Plans are in development for further 200+ MW within 3 to 5 years. Adjacent river with high cooling water capacity.

The site is facilitated by Statkraft, based on agreements with private owners. The topography is flat, 500ft / 150m above sea level and 100ft / 35m above adjacent river. Annual mean temperature: 5.1° C /41.28°F and annual precipitation: 32 inches (820 mm).

Dark fibre can be provided from 3 or more providers with connections to Stockholm, London, Amsterdam and Frankfurt. Water & sanitary is provided by municipal water to site and industry water from adjacent river with landowner water rights. Current zoning plan with plot ratio of 0.3 and 2 storeys building height. New Zoning plan is in development with increased building footprint and 30 m+ building height.

Owner The site is facilitated by Statkraft, based on agreements with three private owners
Location Ringerike, Viken
Site accessibility & infrastructure Oslo Airport:           70 km
Train station:            5 km
Highway E16:         1,5 km
Oslo City Center:     60 km
Available power 100 MW available from substation today with additional 200 MW+ within 3-5 years
Connectivity Dark fibre can be provided from
3 or more providers
Zoning Current zoning plan with plot ratio of 0.3 and 2 storeys building height. New Zoning plan in development with increased building footprint and 30 m+ building height. 

  • Substation Capacity
    100 MW (200 MW + within 3-5 years)
  • International Airport
    70 km