Jump to content Jump to navigation Jump to search
Statkraft data centers
Norway
Statkraft

Vestfold data center site

Norway / Other activities / Project

100 acres (40 Ha) flat site, centrally located just 15 minutes from Torp International airport. Abundant power is available on-site.

Project 59°13'50"N 10°17'40"E

Vestfold consists of a flat area of 100 acres (40Ha) situated next to a strong substation with 5x132kV connections. Other infrastructure i.e. dark fibre access, railroad station, highway and international airport are excellent. City centres of Sandefjord and Tønsberg (county capital), are 20 minutes by car. University campus is 30 minutes by car.

The site is facilitated by Statkraft, and ownership consists of one private owner. The site topography is flat. The area is located 207ft (63 m) above sea level, with topography of +/- 3.2ft (1 m). The site is zoned for 1.300.000 square feet (120.000 m2) data center buildings, with a max height of 20 meters.

Annual mean temperature 6°C/42,8°F and annual precipitation is 386 inches (980 mm). Power capacity at site is 80 MW available, with a further 40 MW expansion possible within 24 month. Connectivity can be provided by 2 or more carriers. Dark fibre can be provided from 3 or more providers. Connections can be made to Stockholm, London, Amsterdam and Frankfurt. Water and sanitary are available on site. Zoning and consent is completed by Q4 2018.

Owner The site is facilitated by Statkraft. The ownership consists of one private owner
Location Sandefjord, Vestfold
Area view in Google Maps and Google Earth
Site accessibility & infrastructure

Distances to cities and main infrastructure:
- Torp Sandefjord Airport: 8 miles (13 km)
- Gardemoen Oslo Airport: 97 miles (157 km)
- Stokke train station: <1 mile (<1,6 km)
- Highway E18: <1 mile (<1,6 km)
- Sandefjord city center: 11 miles (18 km)
- Tønsberg city center: 10 miles (16 km)
 - Oslo city center: 69 miles (110 km) 

Site access is already suitable and finished for access with heavy vehicles

Site area 100 Acres (40 Ha). The site is zoned for 1.300.000 square feet (120.000m2) data center buildings, with a max height of 20 meters.
Site topography The site is flat. The area is located 207ft (63 m) above sea level. With topography of +/- 3.2ft (1 m)
Climate Annual mean temperature: 6°C /  42,8°F. Annual precipitation: 386 inches (980 mm)
Power capacity 80 MW + 40 MW within 24 months
Connectivity Dark fibre can be provided from 3 or more providers. Connections can be made to Stockholm, London, Amsterdam and Frankfurt.
Water & sanitary Available on site
Zoning & consent Completed Q4 2018

 

  • Substation Capacity
    80 MW + 40 MW (24 months)
  • International Airport
    13 km

Other data center sites

Contact us