Countries

Global flag icon
Global
Albania flag icon
Albania
Brazil flag icon
Brazil
Chile flag icon
Chile
France flag icon
France
Germany flag icon
Germany
India flag icon
India
Ireland flag icon
Ireland
Netherlands flag icon
Netherlands
Norway flag icon
Norway
Peru flag icon
Peru
Spain flag icon
Spain
Sweden flag icon
Sweden
Turkey flag icon
Turkey
United Kingdom flag icon
United Kingdom
United States flag icon
United States

Site: Telemark

Norway / Other activities / Project

190 acres (77ha) of premium land, less than an hour from Torp International airport next to one of Norway's strongest power connections. The site is expandable up to 730 acres (295ha), creating a rare European opportunity to build a hyperscale data center park.

Project 59° 16'11"N 9°31'18"E

Telemark consists of flat land of 190 acres (77Ha), which could be expanded up 730 acres (295Ha). The site has one of Norway’s strongest substations less than one mile (1,2 km) away, with vast amounts of renewable electricity available. Other infrastructure i.e. dark fibre access, railroad station, higway and international airport are excellent.

The site is facilitated by Statkraft, and the ownership consist of one private owner. The site's topography is divided into three main plateaus. The primary area is located 246 ft (75 m) above sea level. With topography of 6,4ft (+/- 2 m). The total site area is 730 Acres (295 Ha). The site is zoned for 6.800.000 square feet (630.000m2) data center buildings with a max height of 40 meters.

Annual mean temperature is 5°C/41°F and annual precipitation is 330 inches (840 mm). Power capacity at site is 200 MW, however +300 MW is possible within 24 months. Connectivity can be provided from 3 or more providers. Connections can be made to Stockholm, London, Amsterdam and Frankfurt. Water and sanitary are available on site. Zoning and consent is completed by Q4 2018.

 

Owner The site is facilitated by Statkraft. The ownership consist of one private owner.
Location Skien, Telemark
Area view in Google Maps and Google Earth
Site accessibility & infrastructure Distances to cities and main infrastructure:
- Torp Sandefjord Airport: 38 miles (62 km)
- Gardemoen Oslo airport: 114 miles (182 km)
- Skien train station: 5 miles (8 km) 
- Highway E18: 13 miles (21 km)
- Skien city center: 7 miles (9km)
- Porsgrunn city center: 10 miles (16km)
- Oslo city center: 83 miles (132km)
Site area The total area is 1,000 Acres (400 Ha). The site is zoned for 6.800.000 square feet (630.000 m2 ) datacenter buildings with a max height of 40 meters
Site topography The area is divided into three main plateaus. The primary area is located 246 ft (75 m) above sea level. With topography of  6,4ft (+/- 2 m)
Climate Annual mean  temperature: 5°C / 41°F. Annual precipitation: 330 inches (840 mm)
Power capacity 200 MW + 300 MW within 24 months
Connectivity Dark fibre can be provided from 3 or more providers. Connections can be made to Stockholm, London, Amsterdam and Frankfurt.
Water and sanitary Available on site
Zoning and consent Completed Q4 2018
  • Substation Capacity
    200 MW + 300 MW within 24 months
  • International Airport
    62 km

Download PDF fact sheet