Jump to content Jump to navigation Jump to search
River
India
Photo: William Wootton

The Tidong River

  • 1965
    Entered into operation
  • 5 MW
    Installed capacity
  • 21.1 GWh
    Annual production

Pariac hydropower plant is composed of three plants with an effective capacity of 4.9 MW that supply electricity to the main grid. These plants take in the water from the Pariac river and are arranged in a cascade setup.

 

Glacier at Pariac hydropower plant.jpg
Glacier by the Pariac hydropower plant. (Photo: Statkraft)

The capacities of the plants include HHP2 (0.8 MW), HPP3 (1.2 MW) and HPP4 (2.9 MW). 

The annual energy production of the Pariac hydropower plant is about 21GWh, enough to power more than 17,000 homes.

Statkraft has implemented sustainable development projects aimed at adequately improving the quality of life of local villagers in the areas influenced by the Pariac hydropower plant. These projects include the improvement of the maintenance of local routes and recycling programs.

 

The Pariac hydropower plant
Pariac hydropower plant. (Photo: Statkraft)

 

The Pariac hydropower plant
Pariac hydropower plant. (Photo: Statkraft)
Company Ownership share
Statkraft 100%

Find out more about our activities in Peru

Contact us