Jump to content Jump to navigation Jump to search
River
India
William Wootton

The Tidong River

  • 2012
    Entered into operation
  • 25 MW
    Installed capacity
  • 112 GWh
    Annual production

The power plant has a total head of 83m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,415m long tunnel, 5.65m in diameter. The RCC dam is 22m high.

 

Passos Maia hydropower plant
Passos Maia hydropower plant. (Photo: Statkraft)
Company Ownership share
Statkraft 50%
Adami S/A Madeiras 50%

Find out more about our activities in Brazil

Contact us