Jump to content Jump to navigation Jump to search
River
India
William Wootton

The Tidong River

  • 2001
    Entered into operation
  • 5 MW
    Installed capacity
  • 22.1 GWh
    Annual production

The power plant has a total head of 66.5m and the powerhouse is equipped with two Francis turbines, which receive water through an 860m penstock with 1.9m in diameter. The concrete gravity dam is 4m high.

 

Viçosa hydropower plant
Viçosa hydropower plant. (Photo: Statkraft)
Company Ownership share
Statkraft 81.31%
FUNCEF 18.69%

Find out more about our activities in Brazil

Contact us