Jump to content Jump to navigation Jump to search
Dam
Norway
Lars Petter Pettersen

Førrevassdammen

  • 2009
    Entered into operation
  • 29 MW
    Installed capacity
  • 136.5 GWh
    Annual production

The power plant has a total head of 59.77m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,533m long tunnel of 5.5m in diameter.

The facility is comprised of two dams and two separated reservoirs are therefore connected by one derivation tunnel. The first dam, called derivation dam, is a 25m high and 107m long earth gravity dam with segment gates. The second dam, called generation dam, is a 25m high and 55m long concrete RCC dam with free spillway.

 

Francisco Gros hydropower plant
Francisco Gros hydropower plant. (Photo: Statkraft)
Company Ownership share
Statkraft 81.31%
FUNCEF 18.69%

Find out more about our activities in Brazil