ID Date Country Headline
3808.1 20.09.2022 19.39 DE Gas-fired power plant Knapsack 2 will run performance tests on 21/09/2022 from 08:00 until 18:00 with varying output of up to 440MW
3788.1 19.09.2022 13.37 DE Knapsack 2 will run performance tests from 20/09/2022 at 08:00 until 21/09/2022 at 23:59 of up to 420 MW.
3748.4 12.09.2022 15.39 DE Knapsack 2: 426 MW out of 426 MW not available until 13/09/2022 23:59 due to failure.
3748.3 12.09.2022 02.37 DE The Knapsack 2 test run on Monday 12.09.2022 with outputs of up to 420 MW had to be interrupted at 02:20. The plant will not run until further notice.
3768.2 11.09.2022 22.30 DE Outage at gas-fired power plant Knapsack 1: 840MW out of 840MW non-available since 11.09.2022 at 21:00 until 12.09.2022 23:59; reason: failure
3768.1 11.09.2022 21.04 DE Outage at gas-fired power plant Knapsack 1: 840MW out of 840MW non-available since 11.09.2022 at 21:00 until further notice; reason: failure
3748.2 10.09.2022 15.47 DE Gas-fired power plant Knapsack 1: 880 MW out of 880 MW non-available from 10/09/2022 at 01:00 until 10/09/2022 at 16:00
3748.1 09.09.2022 13.15 DE Gas-fired power plant Knapsack 1: 880 MW out of 880 MW non-available from 10/09/2022 at 01:00 until 11/09/2022 at 16:00
3730.1 08.09.2022 11.41 DE Testing at gas-fired power plant Knapsack 2: Production of up to 426 MW
3728.2 06.09.2022 19.15 DE The gas-fired power plant Knapsack 2 will perform test runs with varying output of up to 420 MW.
3728.1 06.09.2022 17.15 DE The gas-fired power plant Knapsack 2 will perform test runs with varying output of up to 420 MW.
3708.1 05.09.2022 16.56 DE Gas-fired power plant Knapsack 2 will perform test runs with varying output of up to 420 MW.
3668.2 30.08.2022 18.12 DE The Knapsack 2 test run on Tuesday, 30.08.2022 with outputs of up to 420 MW had to be interrupted at 18:10. The plant will not be running anymore on this day.
3668.1 29.08.2022 13.14 DE Knapsack 2 will perform test runs on Tuesday, 30.08.2022 12:00 until 23:59, with varying output up to 420 MW
3648.2 26.08.2022 16.21 DE Planned test runs for gas-fired power plant Knapsack 2 have been cancelled.
3648.1 26.08.2022 15.52 DE Gas-fired powerplant Knapsack 2 will perform test runs betweenn Saturday, 27.08.2022, 12:00, and Sunday, 28.08.2022, 19:00, with varying output of up to 400MW
3628.1 22.08.2022 11.07 DE Knapsack 2 will perform test runs on Tuesday, 23.08.2022 12:00 until Thursday, 25.08.2022 20:00, with varying output up to 420 MW
3588.2 19.07.2022 20.19 DE Knapsack 1 will perform test runs on Monday, 18.07.2022. 11h-00h, and on Tuesday, 19.07.2022, 00h-24h, with varying output of up to 850MW
3610.1 19.07.2022 15.12 DE The gas-fired power plant Knapsack 1 is running various tests. Output may reach up to 845MW.
3588.1 18.07.2022 10.27 DE Knapsack 1 will perform test runs on Monday, 18.07.2022. 11h-00h, and on Tuesday, 19.07.2022, 00h-23h, with varying output of up to 850MW